Handover
Customer Success to project delivery and the general contractor
Handover packs
4
Scope gaps open
3
In review
1
Accepted
2
Each contracted deliverable is compared with the design and the build plan. Any difference is shown in red as a scope gap with an owner and a resolution date.
Campus Strait-1 Hall B inference pod
2 scope gapsIn review
| Deliverable | Contracted | Designed | Built or planned | Scope gap |
|---|---|---|---|---|
| Power | Max 130 kW per rack | Max 100 kW per rack | Max 100 kW per rack | Scope gap Delivery: design lead Resolve by 2026-11-08 |
| Cooling type and density | Direct liquid cooling, 30°C supply | Direct liquid cooling, 30°C supply | Direct liquid cooling, 30°C supply | Matches |
| Space | Dedicated hall, 40 MW | Dedicated hall, 40 MW | Dedicated hall, 40 MW | Matches |
| Connectivity | 2 diverse fibre entry points | 1 fibre entry point | 1 fibre entry point | Scope gap Operations: network lead Resolve by 2026-11-15 |
| Ready-for-service date | 2026-12-01 | 2026-12-01 | 2026-12-01 | Matches |
| Security | Biometric access, escorted visitors | Biometric access, escorted visitors | Biometric access, escorted visitors | Matches |
| Sustainability commitments | 100% renewable energy matched annually | 100% renewable energy matched annually | 100% renewable energy matched annually | Matches |
Campus Strait-1 Hall A GPU lease
GPU Cloud M · C-2007 · Customer Success to Project delivery and general contractor
1 scope gapAccepted with exceptions
| Deliverable | Contracted | Designed | Built or planned | Scope gap |
|---|---|---|---|---|
| Power | Max 140 kW per rack | Max 140 kW per rack | Max 140 kW per rack | Matches |
| Cooling type and density | Direct liquid cooling, 32°C supply | Direct liquid cooling, 32°C supply | Direct liquid cooling, 32°C supply | Matches |
| Space | Dedicated hall, 70 MW | Dedicated hall, 70 MW | Dedicated hall, 70 MW | Matches |
| Connectivity | 2 diverse fibre entry points | 2 diverse fibre entry points | 2 diverse fibre entry points | Matches |
| Ready-for-service date | 2024-07-01 | 2024-07-01 | 2024-07-01 | Matches |
| Security | Biometric access, escorted visitors | Biometric access, escorted visitors | Biometric access, escorted visitors | Matches |
| Sustainability commitments | 100% renewable energy matched annually | 100% renewable energy matched annually | 80% renewable supply contracted | Scope gap Commercial: energy procurement Resolve by 2026-12-15 |
Campus North-1 storage sale order
Accepted by delivery
| Deliverable | Contracted | Designed | Built or planned | Scope gap |
|---|---|---|---|---|
| Power | Max 20 kW per rack | Max 20 kW per rack | Max 20 kW per rack | Matches |
| Cooling type and density | Air cooled, 27°C supply | Air cooled, 27°C supply | Air cooled, 27°C supply | Matches |
| Space | Caged suite, 15 MW | Caged suite, 15 MW | Caged suite, 15 MW | Matches |
| Connectivity | 2 diverse fibre entry points | 2 diverse fibre entry points | 2 diverse fibre entry points | Matches |
| Ready-for-service date | 2026-11-01 | 2026-11-01 | 2026-11-01 | Matches |
| Security | Biometric access, escorted visitors | Biometric access, escorted visitors | Biometric access, escorted visitors | Matches |
| Sustainability commitments | 100% renewable energy matched annually | 100% renewable energy matched annually | 100% renewable energy matched annually | Matches |